The inspection before you accept keys. Every unfinished, damaged or out of tolerance item written down while the builder is still obliged to fix it.
Two thirds of everything we photograph in Clyde comes from this stage, because it is where a build that has been pushed to a date finally shows what was skipped.

Annotated findings from Pre-handover (PCI) inspections on Clyde builds. Client addresses withheld.




1Bored piersAfter the holes are bored and steel cages are placed, before concrete
2Slab pre-pourThe day before the pour, while steel and pods are still open to view
3FrameOnce the frame and roof trusses are up, before sarking and cladding
4Lock-up (pre-plaster)After cladding, roof and external doors, before plaster goes on
5FixingOnce skirtings, architraves, doors and joinery are in, before painting
6WaterproofingAfter the membrane is applied, before any tile is laid over itInstant online pricing, or talk to the booking team on 1300 471 805.
Send it as soon as you have it. The leverage is strongest before you sign at practical completion.
They generally do, because every item is referenced to the tolerance or the contract rather than to taste.
Yes, a reinspection checks each item off before settlement.
Energising circuits, pressure testing, commissioning heating and cooling, testing appliances or garage door safety systems, and anything concealed or blocked.
Two to three hours for a typical Clyde home, longer for a double storey.
Your contract and selections, the Guide to Standards and Tolerances 2015, the NCC and ABCB Housing Provisions.