
When to book each stage inspection on a Clyde build
The order Clyde trades follow, and the window before each stage is covered.
What our inspectors know about building, buying and owning in Clyde.

The order Clyde trades follow, and the window before each stage is covered.

Bracing, tie-down and plumb, measured against N2 wind loads.

Sarking, flashings and window seals, checked while they can still be seen.

What to have in hand before you sign at practical completion.

The findings that repeat across Clyde pre-handover reports.

Closing out the PCI list before you hand over the balance.

How the tolerances guide settles the argument.

Writing, escalating and the Victorian dispute path.

Why membrane defects are the most expensive thing to find late.

Drainage, roof water and workmanship, not age.

What each scope covers and which one you need.

The five minute version, before you pay for anything.

The barrier, the notice and what goes wrong with both.

The things around a house that invite termites in.

AS 4349.3, honestly explained.
Instant online pricing, or talk to the booking team on 1300 471 805.
Start with the stage timing guide, then the frame inspection guide. Those two decide most of what you can influence.
When the standards or the Victorian regulator change, and whenever what we find on site shifts.
Yes. They are written to be readable by both sides.